Retrieves a list of Task Ids that represent the Critical Path for the Schedule.
Critical Path calculation is complicated and might take a long time to compute, so if anything is changed to invalidate the Critical Path, the property isStale is returned true until the calculations are completed.
A Critical Path is the longest sequence of Tasks that must be completed to execute a project. This helps determening the shortest time possible to complete the project.
Authentication
Requires Authorization header with valid Bearer token for scope itwin-platform.
For more documentation on authorization and how to get access token visit OAUTH2 Authorization page.
Rate limits
All iTwin Platform API operations have a rate limit. For more documentation on that visit Rate limits and quotas page.
Request parameters
The unique identifier of the Schedule.
The $top system query option requests the number of items in the queried collection to be included in the result. When $top parameter is not provided default is set to 100. $top value cannot exceed 10000.
A token used for pagination to retrieve the next set of results. It indicates where the previous page of results ended, allowing you to fetch the subsequent batch of data.
Request headers
A header that makes the request conditional. If the ETag of the requested resource or resource collection matches the provided value, a 304 (Not Modified) response is returned. For more information see the official documentation.
OAuth access token with itwin-platform scope
Setting to application/vnd.bentley.itwin-platform.v1+json is recommended.
Response 200 OK
OK
{ "criticalPath": [{ "taskId": "1f93f0a2-236a-4abb-8297-3c5b4b26c0da" }, { "taskId": "58295622-2b77-4620-a6f4-8cbf5838d252" }], "isStale": false, "_links": { "self": { "href": "https://api.bentley.com/schedules/5e11b21e-cba2-48a8-a2c1-2977d2d373e0/tasks/critical-path?$top=2" }, "next": { "href": "https://api.bentley.com/schedules/5e11b21e-cba2-48a8-a2c1-2977d2d373e0/tasks/critical-path?$top=2&$continuationToken=eyJQcmltYXJ5U2tpcFRva2VuIjoiMDAwNGE5MDAtM2UxYy00NGNlLThhMzktYWUxZWRlY2M1MWY0IiwiU2Vjb25kYXJ5U2tpcFRva2VuIjpudWxsfQ==" } } }
Response headers
A token used for pagination to retrieve the next set of results. It indicates where the previous page of results ended, allowing you to fetch the subsequent batch of data.
A header that identifies a specific version of a resource or resource collection. For more information see the official documentation.
Response 304 Not Modified
Not Modified
Response 400 Bad Request
The 400 (Bad Request) status code indicates that the request cannot be processed by the server due to a client error (e.g. malformed request syntax).
{ "error": { "code": "InvalidSchedulesRequest", "details": [{ "code": "InvalidValue", "message": "Top value is not positive, or exceeds maximum page size.", "target": "$top" }, { "code": "InvalidValue", "message": "Provided continuation token is invalid.", "target": "$continuationToken" }], "message": "The request contains invalid properties." } }
Response 401 Unauthorized
This response indicates that request lacks valid authentication credentials. Access token might not been provided, issued by the wrong issuer, does not have required scopes or request headers were malformed.
{ "error": { "code": "HeaderNotFound", "message": "Header Authorization was not found in the request. Access denied." } }
Response 404 Not Found
This response indicates that the provided Schedule is not available.
{ "error": { "code": "ScheduleNotFound", "message": "Requested Schedule is not available.", "target": "scheduleId" } }
Response 429 Too many requests
This response indicates that the client sent more requests than allowed by this API for the current tier of the client.
{ "error": { "code": "RateLimitExceeded", "message": "The client sent more requests than allowed by this API for the current tier of the client." } }
Response headers
Number of seconds to wait until client is allowed to make more requests.
Link
Hyperlink container.
Hyperlink to the specific entity.
{ "type": "object", "properties": { "href": { "type": "string", "description": "Hyperlink to the specific entity." } }, "description": "Hyperlink container.", "additionalProperties": false }
Error
Contains error information.
One of a server-defined set of error codes.
The target of the error.
A human-readable representation of the error.
{ "type": "object", "required": [ "code", "message" ], "properties": { "code": { "type": "string", "description": "One of a server-defined set of error codes." }, "target": { "type": "string", "nullable": true, "description": "The target of the error." }, "message": { "type": "string", "description": "A human-readable representation of the error." } }, "description": "Contains error information.", "additionalProperties": true }
Paging Links
URLs for redoing the current request and/or getting the next page of results if applicable.
{ "type": "object", "title": "Paging Links", "properties": { "next": { "$ref": "#/components/schemas/Link" }, "self": { "$ref": "#/components/schemas/Link" } }, "description": "URLs for redoing the current request and/or getting the next page of results if applicable.", "additionalProperties": false }
CriticalTask
Task which belongs to the Critical Path.
The unique identifier of the Task.
{ "properties": { "taskId": { "type": "string", "description": "The unique identifier of the Task." } }, "description": "Task which belongs to the Critical Path.", "additionalProperties": false }
DetailedError
Contains error information and an array of more specific errors.
One of a server-defined set of error codes.
The target of the error.
A human-readable representation of the error.
{ "type": "object", "required": [ "code", "message", "details" ], "properties": { "code": { "type": "string", "description": "One of a server-defined set of error codes." }, "target": { "type": "string", "nullable": true, "description": "The target of the error." }, "details": { "type": "array", "items": { "$ref": "#/components/schemas/Error" }, "description": "Optional array of more specific errors." }, "message": { "type": "string", "description": "A human-readable representation of the error." } }, "description": "Contains error information and an array of more specific errors.", "additionalProperties": true }
Error Response
Gives details for an error that occurred while handling the request. Note that clients MUST NOT assume that every failed request will produce an object of this schema, or that all of the properties in the response will be non-null, as the error may have prevented this response from being constructed.
{ "type": "object", "title": "Error Response", "required": [ "error" ], "properties": { "error": { "$ref": "#/components/schemas/Error", "description": "Error information." } }, "description": "Gives details for an error that occurred while handling the request. Note that clients MUST NOT assume that every failed request will produce an object of this schema, or that all of the properties in the response will be non-null, as the error may have prevented this response from being constructed.", "additionalProperties": false }
CriticalPathResponse
List of Tasks belonging to the Critical Path.
Is this Critical Path stale. The Critical Path becomes stale when changes were made to Tasks or Task Links but the Critical Path is still being calculated.
{ "properties": { "_links": { "$ref": "#/components/schemas/PagingLinks" }, "isStale": { "type": "boolean", "description": "Is this Critical Path stale. The Critical Path becomes stale when changes were made to Tasks or Task Links but the Critical Path is still being calculated." }, "criticalPath": { "type": "array", "items": { "$ref": "#/components/schemas/CriticalTask" }, "description": "A List of Tasks belonging to the Critical Path." } }, "description": "List of Tasks belonging to the Critical Path.", "additionalProperties": false }
Detailed Error Response
Gives details for an error that occurred while handling the request. Note that clients MUST NOT assume that every failed request will produce an object of this schema, or that all of the properties in the response will be non-null, as the error may have prevented this response from being constructed.
{ "type": "object", "title": "Detailed Error Response", "required": [ "error" ], "properties": { "error": { "$ref": "#/components/schemas/DetailedError", "description": "Error Detailed information." } }, "description": "Gives details for an error that occurred while handling the request. Note that clients MUST NOT assume that every failed request will produce an object of this schema, or that all of the properties in the response will be non-null, as the error may have prevented this response from being constructed.", "additionalProperties": false }